
Before:
The electrical compound was badly damaged when a car crashed into it. MTI was assigned to demolish the damaged building and build a new one to Western Power standards and requirements.
After:
The electrical compound was badly damaged when a car crashed into it. MTI was assigned to demolish the damaged building and build a new one to Western Power standards and requirements.
After:
CUSTOM BUILT SHED
Before:
During:
Completed:
The owners of Trafalgars Bunbury assigned MTI the job of building them a new bulkhead above the existing bar.
The bulkhead was designed and built by MTI. During this time, they supervised the installation of new flooring
throughout the Pool area. After:
"Well done, MTI and staff! Yet another project completed that exceeded our expectations!
As with your past projects in other areas of the hotel, we were impressed with your ability to overcome the challenges that such an old building presented.
Your attitude that 'most things are possible' has achieved this great outcome.'
Management - Trafalgars Hotel.
During:
Completed:
TRAFALGARS HOTEL
Before:
The owners of Trafalgars Bunbury assigned MTI the job of building them a new bulkhead above the existing bar.The bulkhead was designed and built by MTI. During this time, they supervised the installation of new flooring
throughout the Pool area. After:
"Well done, MTI and staff! Yet another project completed that exceeded our expectations!
As with your past projects in other areas of the hotel, we were impressed with your ability to overcome the challenges that such an old building presented.
Your attitude that 'most things are possible' has achieved this great outcome.'
Management - Trafalgars Hotel.






